Home > Cases
C1-G4/2(ESE)/ Lots No.1 & 6 for National Electrification Project,  IDA Credit No. 5727-MM
C1-G4/2(ESE)/ Lots No.1 & 6 for National Electrification Project, IDA Credit No. 5727-MM
Project Location: Myanmar (2018)
Product: ACSR 95/15mm²
Obras eléctricas e interconexión eléctrica -Terminal Portuario Paracas
Project Location: Peru (2018)
Product: 18/30kV MV CABLE NA2XSY 1X400mm²
1320Mw Port Qasim Power Plant To Matiari
500kV D/C Quad/Bundle Transmission Line From 1320Mw Port Qasim Power Plant To Matiari
Project Location: Pakistan (2018)
Product: Conductor AAAC, Alumoweld Shield Wire.
Project In The Idenot Region
Proyecto Rehabilitacion De Redes De Distribucion De Electricidad Lote X. Zona Edenorte, Republica Dominicana Construccion Redes De Distribucion 12.5kV
Project Location: Republica Dominicana (2018)
Product: Concentric Cable, ABC Cable, Conductor AAAC
Lpi-002-2017-Mt-Enatrel
LPI-002-2017-MT-ENATREL "Suministros de bienes y servicios conexos delaumento de la capacidad de transformacion en las Subestaciones San Benito,Catarina, Diriamba , Acahualinca y Ticuantepe II"
Project Location: Nicaragua (2018)
Product: Conductor ACSS/TW
Transmission Line Power
330KV Transmission Line Power Enhancement Project from Aboadze to Prestea
Project Location: Ghana (2016)
Product: ACSR TERN, ACS 7/3.26mm, OPGW-48B1-115, ADSS-48B1-100SPAN
 4 5 6 7 8