Dec 31, 2016

330KV Transmission Line Power Enhancement Project from Aboadze to Prestea

Share:

Project Location: Ghana (2016)
Product: ACSR TERN, ACS 7/3.26mm, OPGW-48B1-115, ADSS-48B1-100SPAN.
Related Cases
±660kV Matiari-Lahore Hvdc Transmission Project
More
31 / 08
Línea y Subestación MDP II y MDP III
More
31 / 07
Para Reemplazo De Conductor LT 220kV Pomacocha-San Juan
More
24 / 01